Island Base
It leads to solving general foundation construction issues and improving productivity, resulting in high turnover and high profits.
"Iland Base" is a groundbreaking new construction method that realizes precasting and independence for the foundation's rising portion. In the case of a single building, on-site foundation work usually takes 2 to 3 weeks, but with this method, it can be shortened to about 1 week. By producing and managing the rising portion in a factory, we achieve stable high quality and high strength. Additionally, processes such as finishing the top and outer perimeter of the foundation are no longer necessary, leading to increased efficiency. Pipes can also be routed through the independent sections, allowing for flexible layouts. Please feel free to contact us. 【Features】 ■ Shortened construction period ■ Improved quality ■ Environmental enhancement ■ Increased efficiency *For more details, please download the PDF or feel free to contact us.
- Company:芳賀セメント工業
- Price:Other